Gas to Wire Field Units

 

Evolution of working Units in the field for test and validation:

 

  • POC #1: single reactor core in HHR module, unreliable water and gas feed method, 8-inch CO2 removal columns

  • POC #2: single reactor core in HHR module, improved water and gas feed method, 10-inch CO2 removal columns

  • POC #3: dual reactor cores in HHR module, further improved water feed to increase fidelity of flow measurement, 10-inch CO2 removal columns

POC 1
POC 1

Outside San Antonio, TX

press to zoom
POC 1
POC 1

Location Map

press to zoom
POC 1
POC 1
press to zoom
POC 2
POC 2

Outside Williston, N.D

press to zoom
POC 2
POC 2

Outside Williston, N.D

press to zoom
POC 2
POC 2

Inside Control Center

press to zoom
POC 3
POC 3

Completed 9/29/15. To be deployed in field10/15/15

press to zoom
POC 3
POC 3
press to zoom
POC 3
POC 3

Fabrication

press to zoom