Gas to Wire Field Units
Evolution of working Units in the field for test and validation:
-
POC #1: single reactor core in HHR module, unreliable water and gas feed method, 8-inch CO2 removal columns
-
POC #2: single reactor core in HHR module, improved water and gas feed method, 10-inch CO2 removal columns
-
POC #3: dual reactor cores in HHR module, further improved water feed to increase fidelity of flow measurement, 10-inch CO2 removal columns
POC 1
Outside San Antonio, TX
POC 1
Location Map
POC 1
POC 2
Outside Williston, N.D
POC 2
Outside Williston, N.D
POC 2
Inside Control Center
POC 3
Completed 9/29/15. To be deployed in field10/15/15
POC 3
POC 3
Fabrication